[J-GATE3.0] What is the maximum value of information to be obtained by one polling/ query?
Up to 64,000 bytes of information can be obtained with one polling or query. If more than that numbers are defined, the error code "-2004" will be output. Show Details
[J-GATE3.0] How can users acquire BO5 data without API?
API is the only way to retrieve BO5 data. In terms of providing order information, JPX provides "Alternative Data Service" which is fee-charging. This orde... Show Details
[J-GATE3.0] If order placement and order inactivation occurs at the same time, is there a case th...
If order placement and order inactivation occurs at the same time, one BO5 (Order reception and result notice) with structure (34005) and structure (34902) i... Show Details
[J-GATE3.0] What does the error code "-2012" mean?
"-2012" is an error output from the API kit when the communication with J-GATE is not established properly. Show Details
[J-GATE3.0]What types of circuit breaker are there on J-GATE?
There are DCB (Dynamic Circuit Breaker) and SCB (Static Circuit Breaker). DCB is a rule that from the viewpoint of preventing sudden price fluctuations,... Show Details
[J-GATE3.0] What is a member number? Is the member number fixed value?
Member number is a value that is set to [cst_id_n] of DA6, which is an answer to DQ6 (Broker Information). If the sponsoring sub-participant wishes to recei... Show Details
[J-GATE3.0] Can closing condition orders (closing limit order, closing market order) be placed fo...
Combination series order cannot be placed with closing condition (closing limit order, closing market order). For details, please refer to “4.6.6.3 How to s... Show Details
[J-GATE3.0] During Storm Control, can orders be cancelled?
Orders can be cancelled via another circuit since Storm Control is applied on circuit basis. If the "Cancel on Disconnect" function of J-GATE is enabled, or... Show Details
[J-GATE3.0] Is it possible to continue sending orders from a separate circuit during Storm Control?
As your understanding, it is possible to continue ordering. Since Storm Control is regulated in circuit basis, orders can be placed by using circuits other ... Show Details
[J-GATE3.0] Will different values be set to [match_group_nbr_u] (Match Group Number) for each exe...
"0" is set to [match_group_nbr_u] (Match Group Number) in all BD6 when normal order is executed with multiple orders in a single deal. On the other hand, di... Show Details
51-60 of Total 164