[arrowhead4.0] Could you tell me renewal price interval for Equities Trading on arrowhead?
A special quote is indicated whenever prices look likely to jump beyond a certain price range (quote parameter) from the last execution price, to prevent sho... Show Details
What is the PING IP address to check the network connectivity to TFX?
As TFX does not have facility to respond to the PING, please check the connectivity with Telnet (or any other ways) . Show Details
[arrowhead4.0] Could you tell us regarding the Contact Information for the Weekend Test (User Con...
The contact information for both weekday tests and weekend tests is as follows.JPX Service Desk (arrowhead/ToSTNeT)TEL: +81-50-3822-8882E-mail: arrowhead@jpx... Show Details
Is there any requirement of minimum usage period for arrownet line? Is there a penalty fee?
The minimum usage period is one year.If cancelled before minimum usage period, the penalty fee will be imposed. Show Details
What is the contact information for the clearing system such as JSCC and JPX Service Desk?
Please contact these desks as below -1. Application/Failure[Application] JPX Service Desk (application procedure)TEL: 050-3819-1070Email: servicedesk@jpx.co.... Show Details
Which application form should I submit if I want to remove arrowhead virtual server?
Please submit a removal application form from "arrowhead Virtual Server List" on arrowface.*Please refer to "arrowface Operation Manual" 4-1-9. Removal Virtu... Show Details
Where is the location of each access point (AP) of arrownet?
Each access point (AP) is located as below.AP2 : SaitamaAP3 : ToyosuAP4 : Osaka Show Details
[arrowhead4.0] We would like to participate in tests for the Production/Test Environment. Can we ...
Please refer to "User Connection Test Guide for arrowhead" for the latest schedule.For the location of the latest version, please see "Latest Documents List"... Show Details
[arrowhead4.0] When does the billing start/end for arrowhead Virtual Server fee for the productio...
Virtual Servers that are in production operation on the first business day of month will be charged the amount of the monthly fee for the month. There is no ... Show Details
[arrowhead4.0] Is it possible to use both FLEX Standard and Market by Order BC (MBO BC) on a sing...
For the production environment, FLEX Standard and Market by Order BC (MBO BC) require 500M and 450M each, so 1G line is required at least.Although there may ... Show Details
31-40 of Total 196